The piping originally was steel with black fittings. The big problem was mud
and bacteria buildup within the floor tubing and the air permeation was causing
problems with the boiler system itself.
To protect the boiler and complete system we removed all the steel
and replaced everything to the floor manifolds with Type L copper.
By making these changes we increased the life expectancy of this heating system.
The system runs at a lower temp. so we used a single bubble foil reflective insulation that has a protective coating against the copper pipe and fittings.